What this work involves
Assess cooling load, connections and routes for pipes and condensate. Include shading in the decision.
- Rooms and use
- Indoor and outdoor units
- Pipe routes, noise and maintenance
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Discuss where technical equipment can go without disrupting the facade rhythm.
Decide this before construction
Photograph retained details before dismantling. Check the dimensions of new components against the actual facade before production begins.
Allow for later maintenance
Record which elements are new, repaired or retained. This distinction helps identify the appropriate finish and maintenance method for each material later.
Cost factors for this service
Costs depend on room count, system type, pipe length and installation. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for air conditioning & cooling. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging air conditioning & cooling?
Refrigerant work should be undertaken by an appropriately qualified specialist. Confirm the contractor and maintenance arrangements beforehand.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

