What this work involves
Do not disturb suspect material. Establish the survey, notifications and qualified contractors required for the particular situation.
- Survey report
- Scope and qualified contractor
- Clearance and subsequent scheduling
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Base design and specialist assessment on measured facade details.
What the drawing needs to explain
Draw a scaled elevation showing existing and new windows together. Resolve the roof-edge, wall and window junction before deciding from an atmosphere image alone.
Decide this before construction
Photograph retained details before dismantling. Check the dimensions of new components against the actual facade before production begins.
Compare the complete intervention
Allow a separate item for making good around the junction. The new wall may be precisely priced while adjustments to existing pointing, mouldings and finishes remain missing.
Cost factors for this service
Costs depend on investigation, material type, access and removal scope. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for asbestos surveys & removal planning. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging asbestos surveys & removal planning?
The required process depends on materials and work. No in-house asbestos certification is claimed; the appointed specialist must be confirmed beforehand.
Official background: Dutch Government (Dutch).
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

