What this work involves
List equipment, lighting and controls per room. Coordinate routes with structure and finishes. Use professionals appropriate to the installation.
- Existing system survey
- Capacity and points
- Safe accessible routes
- Kitchen, bathroom and heating coordination
- Testing, records and explanation
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Base design and specialist assessment on measured facade details.
What the drawing needs to explain
Draw a scaled elevation showing existing and new windows together. Resolve the roof-edge, wall and window junction before deciding from an atmosphere image alone.
Decide this before construction
Photograph retained details before dismantling. Check the dimensions of new components against the actual facade before production begins.
Compare the complete intervention
Allow a separate item for making good around the junction. The new wall may be precisely priced while adjustments to existing pointing, mouldings and finishes remain missing.
Cost factors for this service
Scope, access and replacement requirements determine the budget.
Bring this to the discussion
Plans showing equipment and points, with existing system information.
Questions about the work
When should connection points be final?
Preferably before walls and floors close. A room plan with furniture and equipment reduces later cutting and repair.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

