What this work involves
Have the installer assess the available supply, cable route, mounting position and interaction with other equipment.
- Position and cable route
- Load management and use
- Controls and cost allocation
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Discuss where technical equipment can go without disrupting the facade rhythm.
Decide this before construction
Photograph retained details before dismantling. Check the dimensions of new components against the actual facade before production begins.
Allow for later maintenance
Record which elements are new, repaired or retained. This distinction helps identify the appropriate finish and maintenance method for each material later.
Cost factors for this service
Costs depend on connection work, excavation, charge point and electrical upgrades. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for ev charge points. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging ev charge points?
Shared parking also requires clarity about permission, management and cost allocation. These arrangements must suit the actual location.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.