What this work involves
Define whether the work solves storage, circulation or finishing. Include operation, maintenance and access to services. Final measurement should follow reliable building dimensions.
- Function and arrangement
- Material and finish
- Fittings and lighting
- Floor, wall and ceiling connections
- Measuring and installation
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Relate new skirtings and trims to the chosen transition between styles.
What the drawing needs to explain
Draw a scaled elevation showing existing and new windows together. Resolve the roof-edge, wall and window junction before deciding from an atmosphere image alone.
How to review the result
Review the result close up and from the garden. Check junctions and continuous lines; a neat individual joint says little about the coherence of the entire elevation.
Cost factors for this service
Material, fittings, detail and installation determine the price.
Bring this to the discussion
A sketch, photographs, approximate dimensions and the intended function.
Questions about the work
When can bespoke work be measured?
When the relevant dimensions are reliable. Allow for floor and plaster finishes still to be added.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

